ENVIRONMENTAL NOTICES
PROJECT TITLE:
Monk Hill Treatment System
PROJECT LOCATION:
2696 Windsor Ave
Case Manager:
Lanny Woo
PROJECT
DESCRIPTION: The applicant, Pasadena Water and Power,
has filed a Conditional Use Permit application to allow for the
construction, installation, and operation of an ion exchange
(IX) and a liquid granular activated carbon (LGAC) treatment
system to treat groundwater from the four water supply wells
(Arroyo Well, Well 52, Ventura Well, and Windsor Well) of the
Monk Hill Wells. Groundwater extracted from these wells will be
treated using IX to remove perchlorate, LGAC to remove volatile
organic compounds (VOCs), and will be disinfected with gas
chlorine plus ammonium hydroxide prior to storing in the Windsor
Reservoir for distribution. The proposed treatment technology is
approved by the Department of Public Health (DPH) and used at
numerous locations in Southern California for drinking water
application.
Documents
Available for Review:
Last Updated
06/10/2008
|