Engineering Division     
  Standard Plan Code - 700  
engineering home
master sewer plan
SR 710 mitigation project
avenue 64, colorado blvd., la loma rd., and laguna rd.
la loma bridge project
underground utility program
standard plan code
feedback
public works home

 

Standard Plans

Drawing No. Title:
S-702 Turn Bay Transition - Single Double Centerline
S-704 Parking Tee Installation
S-705 Slow School Xing Pavement Markings
S-706 Pedestrian Crossing Pavement Markings
S-707.1
S-707.2
S-707.3

S-707.4
S-707.5
Standard 76 mm Speed Hump
S-708 51 mm High Experimental Speed Hump
S-709.1
S-709.2
Crosswalk Installation
S-710.1
S-710.2
S-710.3
Raised Pavement Marker Installation Detail
S-711 Two-Way Left Turn Lane, Single Yellow Centerline, Solid White Lane Line
S-712 Pavement Markings for Left and Right Turn Lanes
S-713 Limit Line and STOP Pavement Markings
S-714 Lay Out - 3 m Wide Turn Bay Transition
S-715 New Sign Installation
S-716 Post Extension and Sign Mounting
S-717 Stop Sign and Post Replacement
S-718 Stop Sign Post Extension for Street Name Signs Installation

 
  100 N. Garfield Ave.  3rd Floor  Pasadena, CA 91105