Department of Public Works     
 
  SR 710 Mitigation Transportation Improvements  
engineering home
SR 710 mitigation home
traffic improvements
feedback
public works home

Arroyo Parkway Street Enhancement

 

Description:
  • Provide street enhancements between Colorado Boulevard and Glenarm Street
  • Lengthen left turn pockets at various intersections
  • Reconstruct medians
  • Reconstruct or rehabilitate the concrete roadway
  • Street trees
  • Parkway and median landscaping
  • Reconstruct curb and gutter and sidewalk at various locations
  • Aesthetic enhancements
Benefits:
  • Improves traffic flow and reduces congestion in the SR 710 corridor
  • Improves ride on street surface
  • Improves lighting, sidewalks and landscaping
  • Increases pedestrian access and safety with special emphasis around Light Rail stations
  • Facilitates access to the Light Rail station at Fillmore/Del Mar
Estimated Completion:
  • Phase 1 - Winter 2008

  • Phase 2 - Summer 2008

Project Location MapConstruction Status    

 
  P.O. Box 7115  Pasadena, CA 91109-7215