Contractor:
Sully-Miller Contracting Co.Start Date:
September 2007
Anticipated Completion:
Summer 2008
Project Description:
The Arroyo
Parkway Enhancement project
will provide
street enhancements including reconstructed medians,
rubberized asphalt concrete roadway surfacing, and
reconstructed curb, gutter and sidewalk between Colorado
Blvd. and Glenarm St.
Benefits:
-
Improves traffic
flow and reduces congestion
-
Improves lighting,
sidewalks and landscaping
-
Improves pedestrian
access and safety
Current Status:
Construction
of Phase II (Glenarm St. to California Blvd.) is scheduled to
begin May 2008 and be under construction through summer.
Traffic Advisory:
Through August
2008, expect delays between Glenarm St. and California Blvd.