ULI helps city shape the future of the 710 stub

By Pete Ewing

Director, WPRA

In consideration of the complexity and breadth of the city’s project to reconnect the 710 stub with the rest of the city, City Council turned to the Urban Land Institute (ULI) to bring to bear its decades of experience in land use, real estate development, urban design, financing, governance, and community planning.

About the ULI

Founded in 1936, the ULI is a nonprofit education and research organization supported by its members. Its mission is to shape the future of the built environment for transformative impact in communities worldwide. Today, its tens of thousands of members represent virtually every discipline involved in land use and development.

ULI’s examination of other major redevelopment projects such as the Denver Union Station (50 acres); Battery Park City, New York (50 acres); and Harbor Drive Freeway, Portland (37 acres), has been successful and generated substantial new tax revenue for those cities. While Pasadena’s circumstances are unique, these projects offer examples of how strong planning, investment, governance, and long-term management can help create successful districts while generating economic benefits for their cities.

Not its first Pasadena appearance ULI’s relationship with Pasadena has precedent. In 2012, City Council invited the Los Angeles branch of the ULI to convene a multidisciplinary panel to help Pasadena better manage the Central Arroyo Seco, coordinate activities, pool financial resources, and improve the overall user experience.

The team

This time, the ULI team, led by Richard Bruckner, former director of Planning and Development for the City of Pasadena, brought together nine professionals with expertise in all aspects of real estate development.

Planning and implementation

City Council asked the ULI panel to develop a comprehensive implementation framework that addresses funding assembly, delivery acceleration, governance structure, and long-term operations and maintenance, while integrating City Council’s restorative justice goals, urban design concepts, sense of scale, and flexibility.

The resulting report was intended to be a roadmap for that transition. While the recommendations extend through buildout and stewardship, the immediate focus was on the foundational actions needed to shape that process for a project that could take many years — potentially decades — to fully realize.

Pointing to a “north star”

The report opened with a call to establish a clear and durable “north star” at the outset. “The proposed guiding principle — moving Pasadena from division to connection — captures the project’s central ambition, but its practical value lies in how it informs decision-making. This is not a symbolic exercise. In long-duration projects, drift is common: priorities shift, conditions change, and incremental decisions accumulate in ways that can erode the original intent.”

Governance

Perhaps the most important issue is governance. A project of the 710’s size and complexity will require coordination among numerous public agencies, property owners, residents, businesses, developers, and other stakeholders. The ULI recommended that the City create an independent governing organization that would be “led by experienced professionals and supported by an independent board. Such a structure could provide continuity over the project’s multistage, long-term development period.“

While Pasadena has highly capable professional staff, project governance serves a different function: establishing a clear vision, maintaining accountability, coordinating resources, and keeping the project moving over many years and changes in political leadership.

WPRA shares this belief and adds that, as a threshold issue, an independent, outside governing organization must take shape now.

Community involvement

Community involvement is equally important. Residents of west Pasadena have lived with the 710 stub for approximately half a century. And while the future of the 710 is clearly a citywide issue, its physical impacts will be experienced most directly by surrounding neighborhoods.

For that reason alone, west Pasadena residents should have a meaningful seat at the planning table. Moreover, this access should begin early, before major decisions are made, and continue throughout the planning and implementation stages.

A generational opportunity

“The story of this swath of Pasadena has long been defined by interruption,” according to the report. But each new chapter,” the report concluded, “will increasingly be defined by opportunity, healing, and connection. With hope, generations to come will tell this story with pride, as a national model for urban transformation and restorative justice.”

[Editor’s note: To view the entire ULI report, visit wpra.net and select the “Current” dropdown menu, and the Connecting Pasadena Project subhead.]

Note: This article was originally published in the Fall 2026 issue of the West Pasadena Residents’ Association’s The News newsletter. The views expressed here are not necessarily those of the City of Pasadena or Councilmember Madison.