La Loma Road Bridge Closed from July 2015-December 2016

THE LA LOMA ROAD BRIDGE WILL BE CLOSED FROM JULY 27-2015 TO DECEMBER 2016

Attending the " groundbreaking"  ceremony for the La Loma Bridge renovation were (L to R) Councilmember Steve Madison;  Julie Gutierrez, Assistant City Manager and Interim Public Works Director; Steve Wright, City Engineer;  Sue Mossman, Director, Pasadena Heritage and La Loma Bridge Advisory Committee Member.

The bridge is expected to be operational by December, 2016.