Eastside Well Collector and Centralized Disinfection Facility Project

PROJECT ADDRESS
Eastside Well Collector: Multiple street segments and seven well sites; Centralized Disinfection Facility: Jones Reservoir/Hamilton Park Site; north side of Sierra Madre Boulevard between Riviera Drive and Hastings Ranch Road.

PROJECT DESCRIPTION

The Eastside Well Collector and Centralized Disinfection Facility project involves installing the infrastructure necessary to transport groundwater from seven wells in the eastern portion of PWP’s Jones Reservoir and to provide for centralized disinfection of the groundwater from these wells.  To accomplish these objectives, PWP proposes to install 23,587 linear feet of pipeline to collect and transport groundwater from the seven involved wells to the Jones Reservoir site, where a chloramination system would be installed to disinfect the water prior to its storage in the reservoir.  The proposed project includes improvements at each of the well sites and a minor improvement to the Jones Reservoir overflow vault.

 


DOCUMENTS AVAILABLE FOR REVIEW

CONTACT INFORMATION
CASE MANAGER: Elisa Ventura 
EMAIL: eventura@cityofpasadena.net