Glenarm BESS Project

PROJECT ADDRESS
Glenarm BESS Project
52 East Glenarm Street
Pasadena, CA 91105


PROJECT DESCRIPTION

The applicant, the City of Pasadena Water and Power as lead Agency, is proposing to install a 25-megawatt (MW) utility-scale Battery Energy Storage System (BESS) on an approximately 0.59-acre site, within PWP’s existing Glenarm Power Plant, located at 52 East Glenarm Street in the City of Pasadena, California. The proposed Project would charge and store electricity, with a minimum storage capability of four hours. Design, construction, and maintenance of the BESS Project must adhere to all applicable local, State, and federal regulations and protocols.

A private entity would be selected to develop and maintain the BESS and sell the associated capacity and operational attributes to Pasadena under an Energy Storage Agreement (ESA). The ESA would include an option for Pasadena to purchase the BESS at the Commissioned Operating Date (COD), the second year after COD, or the fifth year after COD and any succeeding years.


ENVIRONMENTAL REVIEW

An initial environmental study recommending a Negative Declaration with mitigation measures (Mitigated Negative Declaration) has been prepared. Possible impacts identified in the Initial Study include those related to Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, and Tribal Cultural Resources. With implementation of mitigation measures, all potential impacts would be less than significant.

SUBMITTING COMMENTS

The Notice of Intent and Initial Study/Mitigated Negative Declaration and technical reports can be viewed during regular business hours at the PWP office, 150 South Robles Avenue, Suite 200, Pasadena, California 91101 or online on the City of Pasadena’s Environmental Notices webpage at: https://www.cityofpasadena.net/planning/environmental-notices/

The City will consider all written comments regarding the potential environmental effects of the Project received during the public review period. Comments on the Initial Study and Mitigated Negative Declaration may be received in writing between Monday, January 6, 2025 and Tuesday, February 4, 2025. Written comments, including emails, must be submitted in writing between by 5:00 P.M., February 4, 2025.

Please direct your written comments via email and/or postal service to:

Bob Botkin, P.E.
City of Pasadena Department of Water and Power
85 E State Street
Pasadena, California 91105
Email:  rbotkin@cityofpasadena.net

DOCUMENTS AVAILABLE FOR REVIEW

MEETINGS AND HEARINGS

The Hearing Officer will hold a public hearing to consider the Conditional Use Permit to establish a Major Utility use (Battery Energy Storage System) at the City of Pasadena’s Glenarm Power Plant and the environmental determination which is a Mitigated Negative Declaration

Date: Wednesday, March 19, 2025

Time: 6:00 P.M.

Agenda and Notice of Public Hearing: https://www.cityofpasadena.net/commissions/hearing-officer/

Any interested party or their representative may appear at the meeting and comment on the project. Prior to the start of the meeting, written correspondence may be emailed to commentsHO@cityofpasadena.net or mailed to the address below (note that this email address will not be checked once the meeting starts). If you challenge the matter in Court, you may be limited to raising those issues you or someone else raised at the public hearing, or in written correspondence sent to the Hearing Officer at or prior to the public hearing. The file can be reviewed at the Permit Center, 175 North Garfield Avenue by appointment only.


CONTACT INFORMATION
CASE MANAGER: Bob Botkin, Department of Water and Power
EMAIL: rbotkin@cityofpasadena.net