Building upon the efforts of the 2015 Mobility Element and associated Bicycle Transportation Action Plan, the City of Pasadena commissioned a detailed study to further develop improvements on four north-south bicycle boulevard corridors, or Greenways.
This study evaluated potential benefits and impacts to both bicycle and vehicular traffic and residential parking. Based on this analysis, this study proposed planning level concept plans for each Greenway.
The four Greenways consist of the following:
- El Molino Avenue: Atchison Street to Bonita Drive (approx. 3.8 miles)
- Wilson Avenue: Washington Boulevard to California Boulevard (approx. 2.3 miles)
- Sierra Bonita Avenue: Washington Boulevard to Colorado Boulevard (approx. 1.6 miles)
- Craig Avenue: Orange Grove Boulevard to Del Mar Boulevard (approx. 1.1 miles)
The full report can be reviewed here: Greenways Feasibility Study - February 2021
Concept Plans for each Greenway can be viewed in the links below:
