Introduction
The Greenways Project is an initiative to create calmer streets for residents and enhance walking, biking connectivity and safety. This supports the City’s broader mobility goals and vision for a more connected, sustainable community and city. First identified in the 2015 Bicycle Transportation Action Plan (BTAP) as a way to improve the City's bike network through the expansion of low stress bicycle facilities, Greenways provide a safety benefit to all roadway users by providing for speed reduction treatments on low volume, primarily residential streets.
The City has launched the initial design phase, which includes extensive community engagement. Phase 1 of the project will inform residents about Greenways and gather input on potential safety enhancements. This is a key step in identifying design options, understanding opportunities and challenges, and addressing concerns. This first phase includes the conceptual design of potential enhancements and the ability to implement demonstration efforts using “quick build” temporary treatments to test concepts before moving into final design. Following community engagement, the second phase of the design effort would allow the City to move into final design and subsequently construct the permanent improvements.
Watch this interview with Joaquin Siques, Director of Transportation, to learn more about the Greenways.
The City is committed to a transparent and inclusive process, with multiple opportunities for public input. This includes:
- Public meetings
- A Community Advisory Committee (CAC)
- Feedback opportunities on potential design elements at key design milestones.
All features—such as traffic calming and intersection treatments—will be developed in collaboration with the community to reflect local needs and priorities.
Status
The City kicked off the initial design phase and outreach for the Greenways. The design involves two phases.
- Phase 1:consists of developing concepts for the Greenways and conducting preliminary engineering, which will involve collecting traffic data, exploring design ideas, and engaging residents and community members through extensive outreach. As part of the first phase, a Demonstration Project component along Craig Avenue will be initiated to install temporary treatments, which will be useful for gathering community input and help inform the overall design for permanent treatments. Additionally, a Demonstration Project along El Molino Avenue funded through the Federal Safe Streets for All (SS4A) grant program is also gearing up as a funding agreement has been recently executed. Phase 1 is expected to take up to 24 months.
- Phase 2: advancement of the concept design and finalizing the design plans before advertising the construction of the Greenways. The duration for Phase 2 is expected to be up to 18 additional months.
Community Meetings
Thank you to the more than 300 community members who participated in our summer events for the Pasadena Greenways project! Community feedback and input play a key role in exploring potential safety and traffic improvements that reflect local needs and priorities, guiding Phase 1 efforts including the Craig Ave. Demonstration Project, and informing the overall Greenways development.
Upcoming Meetings
In-Person Community Meeting
Monday, July 27 | 5 PM – 6:30 PM
Caltech Hameetman Center Multipurpose Room
1200 E California Blvd., Pasadena, CA 91125
Bike racks are available adjacent to the Hameetman building. The Caltech campus is served by Pasadena Transit Route 10 and Route 53 and Metro Route 267.
Free parking is located in the parking garage at 370 S. Holliston Ave. after 5 PM.
Spanish interpretation, refreshments, and kids’ activities will be available.
Virtual Community Meeting
Wednesday, July 29 | 6 PM – 7:30 PM
Zoom: bit.ly/GreenwaysVirtualCommunityMeeting
Spanish interpretation will be available

Stay tuned for upcoming events this fall, where we’ll be sharing an update on the project and next steps.
Previous Meetings
Greenways Community-Wide Meeting #1 – June 10, 2026
Stop-by Station for Craig Ave. – June 13, 2026
Craig Ave. Walking Workshop – June 27, 2026
Greenways Community-Wide Meeting #2 – July 27, 2026
Greenways Virtual Community Meeting – July 29, 2026
Community Meeting Resources
Greenways Intro Presentation (English | Spanish)
Greenways Intro Meeting Boards (English | Spanish)
Craig Avenue Demonstration Project Map

What Are Greenways?
Greenways are neighborhood streets designed to moderate vehicle speeds and enhance safety to improve livability for local residents and make it safe to get around whether you are walking, biking, or driving. This is accomplished by installing different traffic calming measures based on mobility goals, plans and community engagement. Some examples of potential neighborhood traffic calming measures include speed humps, tables, or cushions, curb extensions, traffic circles and diverters, and raised median islands. Certain treatment such as traffic diverters have important benefits, but also have important trade-offs to consider, which will be further evaluated with significant community input. Other improvements include enhanced pedestrian crossing treatments, bicycle signage, striping and stenciling, bicycle detection at traffic signals, and enhanced pedestrian crosswalks. These corridors prioritize safety and comfort for people walking, biking, or rolling—whether for commuting, recreation, or daily errands. Greenways also help connect neighborhoods to parks, schools, transit, and local businesses, creating a more livable, people-friendly environment. Importantly for residents Greenways mean the potential for less speeding and crashes on streets used daily.
Background
The 2015 Bicycle Transportation Action Plan (BTAP) and the Mobility Element of the General Plan, Pasadena identified four north-south corridors—called Greenways—to improve safety, connectivity, and accessibility for all road users.
In 2021, the City completed a Greenways Feasibility Study to further explore potential treatments along the existing four north-south corridors. While not all potential treatments were analyzed, the study selected a subset of treatments identified to make local streets safer and more comfortable for walking and biking. The study analyzed traffic patterns, safety issues, parking, and connections to existing bike routes. It also provided cost estimates and potential improvement ideas for each corridor.
The North/South Greenways include:
- El Molino Avenue: Atchison St to Bonita Dr (approx. 3.8 miles)
- Wilson Avenue: Washington Blvd to California Blvd (approx. 2.3 miles)
- Sierra Bonita Avenue: Washington Blvd to Colorado Blvd (approx. 1.6 miles)
- Craig Avenue: Paloma St to Del Mar Blvd (approx. 1.2 miles)
These corridors are key north-south connectors with relatively low traffic volumes that cross the 210 Freeway at intersections that do not have freeway on-ramps or off-ramps, helping to build a citywide bikeway network that supports safe, active transportation. The Greenways will provide important connections to recently completed east-west active transportation connections on Union Street and Cordova Street to create a more complete network for walking and biking in Pasadena.
Funding
The Greenways Project is primarily funded through regional Measure R Mobility Improvement Project (MIP) funding with state and federal sources. In 2022, Pasadena secured $12 million in MIP funding from LA Metro for design and construction. Additional funding has been awarded by the State of California through the Affordable Housing and Sustainable Communities (AHSC) program for the Craig Avenue Demonstration Project effort. The City is also awaiting direction for a grant recommendation award by the Federal Highway Administration (FHWA) through the Safe Streets and Roads for All (SS4A) for a Demonstration Project deployment on El Molino Avenue.
Project features may include:
- Traffic calming measures
- Enhanced signage and pavement markings
- ADA-compliant pedestrian improvements
- Safer crossings and reduced vehicle speeds
These improvements aim to reduce speeding and crashes on neighborhood streets, support walking and biking, and provide more options and ways to get around Pasadena, contributing to a more connected and sustainable Pasadena.
Milestone Timeline
| Year | Milestone |
|---|---|
| 2013 | City Council directs staff to form a bicycle transportation working group to develop an action plan |
| 2014 | Initial community engagement for BTAP |
| 2015 | City adopts bikeway network in BTAP as part of the General Plan, which identifies Greenway routes |
| 2019-2021 | Greenways Feasibility Study conducted, evaluating traffic data and identifying project cost estimates |
| 2021-2022 | Greenways outreach conducted through community meetings; AHSC funding awarded for Craig Avenue Demonstration Project |
| 2022 | Capital Improvement Program established; Measure R MIP funding secured |
| 2024 | Applied for FHWA SS4A funding for El Molino Avenue Demonstration Project |
| 2025 Spring | Solicitation to hire Greenways design consultant |
| 2025 Fall | Award design and community engagement contracts |
| 2026 Spring | Project kick-off (Phase 1) with design and outreach consultants begin; SS4A Agreement Executed with FHWA for El Molino Avenue Demonstration Project |
| 2026 Summer | Round 1 community engagement initiated providing overview of Greenways and seeking input to Craig Avenue Demonstration Project |
| 2026 Fall | Round 2 community meetings planned |
“Quick-Build” Demonstration Project on Craig Avenue
As part of the design (Phase 1), the City has funding to install “quick-build” treatments along the Craig Avenue Greenway. These temporary, easily installed paint and plastic features are part of the engagement process and a tool to allow the community to view and experience potential improvements and provide feedback on potential permanent improvements. All treatments will be refined through community input during the demonstration period.
To improve safety and comfort, the Greenways may include:
- Speed table, humps, or cushions
- Pedestrian crossing enhancements such as flashing lights
- Curb extensions
- Traffic circles and chicanes
- High-visibility crosswalks
Bikeway signage and pavement markings
FAQs
Greenways are neighborhood streets designed to calm traffic, moderate vehicle speeds and enhance safety for people driving, walking, biking, and rolling. The aim is to create safer, more livable streets to give people options to get around the city without needing a car. They have been designated on north-south streets that cross the I-210 freeway, but do not have freeway on-ramps or oƯ-ramps. By reducing speed along Greenways not only is the roadway safer for residents, motorists, and people walking, but it also creates a low stress environment for bicyclists of all ages and abilities to connect to the existing bicycle network.
You can add a comment to sign up for updates in the Comments/Questions section above and indicate to be added to the project mailing list.
No. Greenways are mainly on smaller neighborhood streets and use shared-lane, painted bike markings (sharrows) and traffic calming treatments rather than continuous striped bike lanes. Greenways are intended not just to improve conditions for biking but also to moderate vehicle speeds to improve safety for people driving and walking in the area. There are short street segments leading to and crossing the I-210 freeway that have the width to add bike lanes, which can help to better manage and delineate travel modes, but a determination on the type of treatments to be implemented will be made following a robust community engagement process.
No. Parking removal is not planned along the entire corridor. Some safety upgrades may require removing a small number of parking spaces on a particular block to allow treatments such as small, raised median islands before an intersection, or shifting parking from one side of the street to the other (also known as a parking chicane). These treatments would help to reduce speeds. Any changes to parking will be evaluated on a case-by-case basis and discussed with the community during outreach.
Green paint is typically used for bike lanes at specific locations including conflict points (e.g., intersections or driveways) to increase attention. Since the vast majority of theGreenway corridors will not have a dedicated bike lane, the use of green paint will be minimal, if any.
No. Greenways already have fewer travel lanes with only one lane in each direction and are typically on low-volume residential streets. The short street segments that cross the I-210 freeway can be wide with multiple lanes and will be evaluated to determine if removing a vehicle travel lane is needed to improve safety and create space for people biking and walking.
Yes. The City is committed to extensive community engagement throughout the initial conceptual design process. This includes numerous public meetings that will target each of the corridors, hosting a Community Advisory Committee, and opportunities to provide feedback at key milestones. The objective of the Greenways is to improve safety and moderate vehicle speeds, but the treatments to achieve these outcomes are not predetermined. The purpose of the engagement will be to get feedback from residents and build community consensus on the most appropriate traffic calming treatments for each neighborhood area. Once potential treatments are selected, outreach will also continuethrough the final design process and construction period.
No. The City is still in the conceptual design phase. We have identified potential treatments and features to consider helping calm traffic, improve wayfinding, and create safer crossings at intersections, which will be further developed in collaboration with the community.
Yes. The City plans to deploy Demonstration Projects on corridors like Craig Avenue and El Molino Avenue where appropriate to test treatments and temporary installations using paint and plastic posts and gather community feedback before finalizing designs and installing permanent features. A Demonstration Project is a useful community engagement tool to allow the community to see, use, and experience different options and provide feedback before implementing permanent designs.
Large roundabouts like the one on Ave 64 will not be installed on these narrow streets. Mini roundabouts are being considered as part of the traffic calming toolkit but will be discussed as part of the community outreach process and will only be recommended if they fit within the selected environment. They are effective at reducing speeds and improving safety at intersections. The benefits include keeping traffic moving more efficiently than intersections controlled by stop signs.
We work closely with Pasadena Fire Department to explore safety enhancements that help emergency vehicles respond swiftly and without additional delays. All designs will be reviewed in collaboration with City emergency service providers to ensure no adverse impacts to response times.
These corridors were selected because they are on low-volume, north-south streets that cross the I-210 Freeway without freeway ramps, making them ideal for safe bike and pedestrian travel that help connect and expand the multimodal network throughout the City. They were identified in Pasadena’s 2015 Bicycle Transportation Action Plan as part of the Mobility Element of the City’s adopted General Plan. The purpose of designating them as Greenways is to identify treatments that calm traffic, lower vehicle speeds and enhance safety for people driving, walking, biking, and rolling.
Yes. Speed humps and cushions can now be considered for use on Greenways according to the City’s updated Speed Hump Policies and Procedures. The Greenway must still meet all other physical and operation requirements along the corridor according to the policy before moving forward to a vote.
Traffic diverters are part of the toolkit that includes barriers, curbs, or other treatments that limit cut through-traffic while allowing local access for people walking and biking, as well as allowing access by emergency vehicles. They help reduce cut-through driving and keep through-traffic on main roads. Traffic diverters could typically be installed at locations where a Greenway crosses a street with much higher traffic volumes to help manage cutthrough traffic through a residential neighborhood with narrow streets. The determination of the location of traffic diverters and decision whether or not to include traffic diverters would be made through the public engagement process. This type of treatment would only proceed with the support of the residents along that section of street. Existing examples ofthis treatment in the City of Pasadena include the intersections of Orange Grove Boulevard at Marengo Avenue and El Molino Avenue at Washington Boulevard.
Traffic diversion is a valid concern. The City has already conducted some analysis and will continue to study this during the conceptual design phase prior to recommending any permanent improvements. The project aims to reduce cut-through traffic on Greenway streets and keep through traffic on main roads, without creating spillover traffic to other narrow residential streets.
A majority of the projects are funded through regional transportation grant funds awarded through Measure R Metro Mobility Improvement Project (MIP) funding. In addition, state grant funds were awarded for a quick-build demonstration project on Craig Ave. The City is also awaiting direction for a grant recommendation award by the Federal Highway Administration (FHWA) through the Safe Streets and Roads for All (SS4A) to deploy a quickbuild on El Molino Avenue. These funds have specific eligibility uses that support active transportation and safety improvements. The funds can only be spent on new infrastructure improvements and cannot be used for roadway maintenance or other nontransportation projects or programs.
The City will partner with community-based organizations, offering materials in multiple languages, and hold meetings at accessible times and locations to ensure broad participation.
The use of signs is already part of the existing toolkit. Additional signage may be added where appropriate as part of a solution. Traffic calming treatments such as speed humps, cushions, raised islands, etc. are physical treatments that help slow vehicle speeds that signs alone can’t do. The City will provide the community as part of the engagement process information on the effectiveness of different treatments in moderating vehicle speeds and reducing crashes. The City is balancing effectiveness, cost, and community input to help choose the right mix of solutions.
Yes. Baseline data will be collected and compared with post-implementation data to evaluate the effectiveness of the Greenways in improving safety, reducing speeds, and managing traffic volumes.
Success will be measured using metrics such as reduced vehicle speeds, before and after data, improved safety outcomes, and community feedback. Community feedback will be especially critical as the purpose of the Greenways is to create safe low-stress streets that people feel comfortable walking, biking, rolling, and driving on. While the overall goals are to improve walking and biking access, reduce crashes, and moderate speeds, there are multiple ways to accomplish these goals. Each neighborhood along the Greenways is unique, and the local community will be able to select the most appropriate traffic calming treatments for their neighborhood.