Pasadena Avenue and St. John Avenue Roadway Network Project

Project Summary

A street map of Pasadena, California, centered on the 710 freeway stub between the 210 freeway and Columbia Street. The map highlights St. John Avenue and Pasadena Avenue running parallel north-south, intersected by cross streets such as Walnut St, Colorado Bl, Del Mar Bl, and California Bl. Key landmarks are labeled, including Maranatha High School, Sequoyah School, Singer Park, Huntington Hospital, Arlington Garden, and Westridge School. On the right side, a blue line indicates the route of a light rail line with stations for Memorial Park, Del Mar, and Filmore. A scale bar at the bottom indicates 0.25 and 0.5 miles with a north arrow.The City of Pasadena is studying potential multimodal transportation improvements along Pasadena Avenue and St. John Avenue to create a safer, more connected, and accessible transportation corridors for everyone. The project will enhance approximately 1.8 miles along both avenues, from Walnut Street to Columbia Street, including improvements to connecting cross-streets.

Through community engagement, the project will evaluate transportation improvements that enhance connections to neighborhoods and key destinations, including schools, parks, businesses, healthcare facilities, and transit. These near-term transportation improvements will complement the City’s long-term vision for the area documented in the Reconnecting Pasadena Vision Plan.

Potential improvements may include:

  • Traffic signal upgrades for efficient traffic flow
  • Intersection improvements for safer crossings
  • Sidewalk and accessibility upgrades
  • Upgraded bicycle facilities comfortable for all ages and abilities
  • Enhanced access to transit stops
  • Traffic-calming measures
  • Streetscape improvements

Share Your Feedback

As part of the current stage of the project, the City wants to better understand where people experience transportation challenges and where there may be opportunities for improvement.

Visit the digital interactive map to identify specific locations where you experience transportation challenges, have safety or access concerns, or see opportunities for improvement. You may add comments at as many locations as you would like.

Project Schedule

The project will move through four outreach stages: 

Project timeline showing four stages: Stage 1 (Sept–Nov 2026), Stage 2 (Dec 2026–Feb 2027), Stage 3 (Mar–July 2027), and Stage 4 (Aug 2027–Nov 2028).

Status

The Pasadena Avenue and St. John Avenue Roadway Network builds on prior planning work conducted in 2022 that identified community priorities and potential improvements. Key themes heard from the community include interest in reducing speeding, improving safety and accessibility for walking and biking, improving transit connectivity, and streetscape enhancements. This project allows the City to respond to community feedback collected over several years. The City will now begin working with the community to refine this feedback to design and build improvements that will best serve residents, businesses, visitors, and everyone who travels through the area.

The current stage is focused on documenting existing conditions and validating community priorities. Future stages will involve working with the community to refine and evaluate alternatives, identify a preferred design, and advance the community-selected design through preliminary design and environmental approval.

Community Meetings

Walk. Bike. Drive. Share your ideas on Pasadena Avenue & St. John Avenue

Thank you to everyone who attended our first round of community meetings in October and November 2026! These meetings provided an opportunity to learn about the Pasadena Avenue and St. John Avenue Roadway Network Project, review existing conditions, and share current concerns and priorities for safer, more connected, and accessible travel. Community feedback will help guide the development of preliminary improvement alternatives. To view the meeting presentation slides and materials, please visit the Project Resources section below.

Background

The Pasadena Avenue and St. John Avenue Roadway Network is the next step in an ongoing planning process and builds on years of technical analysis and community input related to Pasadena Avenue, St. John Avenue, and the former SR-710 North Stub.

The project builds upon previous planning efforts related to the former SR-710 North Stub, including technical studies and community input that identified transportation needs and opportunities along Pasadena Avenue and St. John Avenue. The framework for this project was initially developed in 2022 through a series of stakeholder meetings and public events. This work is documented in the Project Development Technical Memorandum – September 2022. This document identified community priorities and potential multimodal improvements and allowed the City to secure grant funding to further engage the community to evaluate concepts, create designs, and construct improvements.

This stage will build on previous concepts, technical studies, and community feedback. These earlier concepts are still under consideration; no final design has been selected. Potential improvements will be evaluated based on current conditions, updated technical analysis, available funding, and community input gathered through this process.

With the State's relinquishment of the former SR-710 North Stub, the City has a new opportunity to evaluate how Pasadena Avenue and St. John Avenue can function as part of Pasadena's local transportation network. The City has secured funding for near-term Complete Streets improvements and can now move from broader planning into more focused evaluation and implementation of transportation improvements along the Pasadena Avenue and St. John Avenue.

Project Goals

Maintain Efficient Travel Operations
Upgrade traffic signal technology and analyze and adjust traffic signal operations to ensure efficient travel operations.

Enhance Safety
Evaluate improvements that enhance safety at intersections, crossings, and along the corridor.

Increase Accessibility
Improve access for people of all ages and abilities through enhanced walking, biking, and transit connections.

Support Multimodal Mobility
Support safe and efficient travel for people walking, biking, taking transit, and driving.

Strengthen Neighborhood Connectivity
Improve connections between neighborhoods and key destinations, including schools, parks, businesses, healthcare facilities, transit, and bicycle networks.

Funding

The City of Pasadena has secured Measure R Mobility Improvement Program grant funding from Los Angeles Metro to plan, design and build the Pasadena Avenue and St. John Avenue Roadway Network Project. The grant funds are specifically designated for Complete Street improvements. Further financial information is available in the City’s Capital Improvement Program.

Frequently Asked Questions

1.  How does the project relate to the Reconnecting Pasadena Vision Plan?

The Reconnecting Pasadena Vision Plan is the long-term plan for the State Route 710 Northern Stub area. The Pasadena Avenue and St. John Avenue Roadway Network project is focused on near-term transportation improvements that can be more immediately designed and installed. All elements of the project will be designed to work in alignment with the longer-term improvements envisioned in the Reconnecting Pasadena Vision Plan.

2. How were potential improvements identified and was the community engaged before grant funding was secured?

Potential project concepts were initially developed in 2022 through a series of stakeholder meetings and public events. This work is documented in the Project Development Technical Memorandum – September 2022. This work allowed the City to secure grant funding to further engage the community to evaluate concepts, create designs, and construct improvements.

4. Have any improvements or designs already been selected?

No final design has been selected. Previous planning work will inform but not predetermine the final multimodal design. Final improvements will be selected based on community input, updated technical analysis, and available funding.

5. How will potential improvements be evaluated?

Potential improvements will be considered based on community input, current conditions, technical analysis, and available funding gathered through this process.

6. Will the project add bicycle improvements or bike lanes?

The project will evaluate enhancing the existing bicycles lanes on Pasadena Avenue and St. John Avenue and identify potential new bicycle connections on east-west cross streets. A key goal will be to better connect this area to the existing City bicycle network to enable residents to travel by bicycle to multiple destinations on low-stress bicycle facilities.

7. Will any vehicle travel lanes or parking be removed?

The project will evaluate options to optimize traffic flow and provide safe paths of travel for pedestrians, cyclists, and drivers. A primary goal of the project will be to maintain efficient vehicle travel operations while also adding Complete Street enhancements. Pasadena Avenue and St. John Avenue would be anticipated to be maintained as two-lane streets. Depending on the design selected by the community, some street parking may be removed to facilitate installation of safety improvements, efficient vehicle travel operations, or addition of Complete Street enhancements. All parking adjustments would only occur after community consultation and input.

8. Could improvements affect traffic on nearby neighborhood streets?

Potentially. As part of the project, the City will conduct traffic modeling to evaluate potential traffic impacts of various design options. We are committed to sharing this information with the community so residents can clearly understand the tradeoffs and potential impacts of each design alternative. The goal throughout the process is to minimize impacts on neighboring roads and communities.

9. How will community feedback be used?

Community input and updated technical analysis will guide the design of future project improvements.

The City is currently documenting existing conditions and will be re-engaging the community. We will combine past feedback with current technical findings with the new resident input to confirm community priorities and develop design alternatives/

Project Resources

Project Factsheet 

Community Meeting Flyer 

District 6 Community Meeting – October 14, 2026

Meeting Video

Pasadena Avenue and St. John Avenue Roadway Network Project – Stage 1: In-Person Community Meeting October 29th 2026

Presentation slides:

Poster Boards:

Pasadena Avenue and St. John Avenue Roadway Network Project – Stage 1: Virtual Community Meeting November 4th, 2026

Presentation slides:

Meeting Recordings:

*Audio for both Spanish and Mandarin recordings begin at 6:10